Kitchen Remodeling in Cambridge, MA.
With a median home value of $1,010,000, Cambridge homeowners invest in quality renovations that hold their value. Schlickmann Construction is 8.0 miles from our Stoneham office, licensed CSL-121587.
Kitchen Remodeling contractor serving Cambridge
Custom kitchen renovations in Stoneham and Greater Boston. Cabinets, countertops, plumbing, lighting, and flooring — all managed in-house from design to final tile.
Cambridge is 8.0 miles from our Stoneham office, in Middlesex County with a population of 118,403 and a median home value of $1,010,000. Homeowners here expect premium finishes, expert craftsmanship, and a contractor who understands high-value properties — that's exactly what we deliver.
What's included
- Free in-home consultation and design review
- 3D renderings and selection assistance
- Permits, inspections, and HOA coordination
- Demolition with daily site protection
- Custom cabinetry design and installation
- Plumbing, gas, and electrical relocations
- Quartz, granite, marble, or butcher block counter installation
- Tile and stone backsplash work
- Recessed, pendant, and under-cabinet lighting
- Flooring (hardwood, LVP, tile)
- Final paint and trim carpentry
- Appliance hookup and final inspection
- 2-year workmanship warranty
Our Kitchen Remodeling process in Cambridge
-
1
Vision Consultation
We walk your kitchen, listen to your goals, and discuss layout possibilities — no sales pressure, just honest advice.
-
2
Design & Selections
We produce 3D renders, finalize cabinet style, countertops, tile, hardware, and appliances, and lock the budget.
-
3
Permits & Demo
We handle every permit and inspection, then demo the existing kitchen with daily site protection and cleanup.
-
4
Build & Finish
Cabinets, plumbing, electrical, tile, counters, and final paint — all managed by our in-house team.
FAQ — Kitchen Remodeling in Cambridge
How long does a typical kitchen remodel take?
Most full kitchen remodels run 6 to 10 weeks once permits are pulled. Layout changes or additions push that to 10–14 weeks. Your detailed plan in step 02 includes a realistic milestone calendar.
Can you work around my existing layout?
Yes. We do plenty of "refresh" projects that keep plumbing and gas in place — replacing cabinets, counters, backsplash, lighting, and flooring without moving walls. This typically runs 5–7 weeks at a lower price point.
Do you handle permits?
Always. Massachusetts requires a permit for most kitchen work involving plumbing, gas, or electrical. As CSL-121587 license-holders, we pull every required permit and coordinate with the local building department on your behalf.
Will I have a kitchen during construction?
We can set up a temporary cooking area in another room, often using a microwave, hot plate, and small fridge. We schedule the demolition and rough-in phases to minimize the no-kitchen window — usually 3–5 weeks.
Kitchen Remodeling near Cambridge
Kitchen Remodeling in Cambridge — done right.
No subcontractors. No surprises. Licensed CSL-121587, BBB A+, and 5.0★ from 50+ homeowners across Greater Boston.
- Free, no-pressure estimate
- Licensed & insured in MA
- On-site within 48 hours